Sinopec Liaoyang Petrochemical 2.4mt/a Residue Oil Hydroprocessing Project
The contract for the project was signed in April 2017. It is a pc contract. The engineering of the heating furnace was carried out by Petro China East China Design Institute, and the Tuopu Industrial Design Technology Center was responsible for the factory's modular design.